Northeast chord building guide telephones. A section of the northeastern chord from the highway of enthusiasts to the Moscow Ring Road was opened

The North-Eastern Chord is a first-class city main street under construction with a continuous traffic regime. It will run from Businovskaya interchange along Zelenogradskaya street. It will cross the 4th Likhachevsky lane and further to the transport interchange with the Northern Rokada. After that, the highway crossing the ways of the October railway will turn east and go along the Small Ring of the Moscow Railway to the Ryazan direction of the Moscow Railways. Further along the railway tracks to the interchange of the Moscow Ring Road with a built section of the new toll federal highway "Moscow - Noginsk - Kazan", which, within the boundaries of Moscow, will be a main street of citywide significance of the first class. Kosinskoye highway will become part of the new federal road.

The northeastern chord will connect major highways in the northeastern part of Moscow: Izmailovskoye, Shchelkovskoye, Dmitrovskoye, Altufevskoye and Otkrytoye highways.

The Northern Rocade is a first-class main street of citywide significance under construction with a continuous traffic regime. The Rokada has a joint section with the North-Eastern Chord, 4 lanes wide for both directions - from the Businovskaya interchange to the actual interchange with the temporary storage warehouse at the intersection of the connecting railway line No. 2 of Likhobory station - Khovrino station. Further, the highway is still passing from west side The OZD will have 3 lanes in each direction. After the interchange with the temporary storage warehouse, an exit to Likhoborskaya embankment will be built. Then, crossing the Cherepanovyh passage, the street will continue until the traffic interchange with the North-Western Chord at the intersection with Bolshaya Akademicheskaya Street. After that, it will enter Dmitrovskoye Highway using the existing interchange of the highway with Valaamskaya Street. The exit will have 2 lanes in each direction.

A dividing strip and retaining walls will be provided on the section of the Northern Rocade from Bolshaya Akademicheskaya Street to Dmitrovskoye Highway, taking into account the prospective extension of the highway to Academician Korolev Street.

According to the project, the North-Eastern Chord consists of the following sections (from east to north):
A section of the Veshnyaki - Lyubertsy highway in the Kozhukhovo microdistrict (Kosinskoye Highway)
Section of the intersection of the Moscow Ring Road with the highway Veshnyaki - Lyubertsy (Kosinskaya overpass).
Plot from Moscow Ring Road on the street. Krasny Kazanets to Veshnyakovskiy overpass.
The section from the Veshnyakovsky overpass to the former 4th transport ring along the alley of the 1st Mayovka and st. Anosov.
Section of the former 4th transport ring to the Oktyabrskaya railway line.
Zelenogradskaya street to the Businovskaya interchange of the Moscow Ring Road.

Construction history
In December 2008, the construction of the Veshnyaki - Lyubertsy highway begins.
On October 26, 2009, a 4-kilometer section of the Veshnyaki-Lyubertsy highway was opened from Proektiruemoy proezd 300 to the street. Bolshaya Kosinskaya.
On September 3, 2011, a kilometer section of the Veshnyaki - Lyubertsy highway from Bolshaya Kosinskaya to the Moscow Ring Road and an interchange with the outside of the Moscow Ring Road were opened.
On November 24, 2011, the construction of the interchange of the Veshnyaki - Lyubertsy section with the inner side of the Moscow Ring Road and the exit to Krasny Kazanets Street was completed.
On March 27, 2013, the construction of an 8-lane highway along Zelenogradskaya st.
On January 30, 2014, traffic was opened on two overpasses of the section of the North-Eastern Expressway from the sh. Enthusiasts to Izmailovsky sh.
On December 24, 2014, traffic was opened along the highway from the Businovskaya interchange to the interchange with Festivalnaya Street.
On March 18, 2015, the construction of a section from Izmailovsky sh. to Shchelkovsky sh. (to be completed in 2017).
On December 29, 2015, construction began on the section from Festivalnaya st. to Dmitrovsky sh. (to be completed by the end of 2018)

Interchange of the North-East Expressway from the Entuziastov Highway

On September 4 and 5, two more sections of the North-Eastern Expressway were opened. the site reminds which sections of the route have already been opened and how they helped the townspeople.

The North-East Chord (SVKh) is becoming more and more distinct on the map of Moscow. Motorists probably actively use four sections: from Businovskaya junction to Festivalnaya Street, from Izmailovsky to Schelkovskoye Highway, from Entuziastov Highway to Izmailovsky Highway, and from Schelkovskoye to Otkrytoye Highway. Now two more are available to them: from the Entuziastov Highway to the Moscow Ring Road and from Festivalnaya Street to Dmitrovskoye Highway.

Thus, the chord became continuous in the sections from the Businovskaya interchange to the Dmitrovskoye highway and from the Open highway to the Moscow Ring Road. it almost 80 kilometers of roads, 67 artificial structures and 14 pedestrian crossings. In the north of Moscow, the chord route continues beyond the Moscow Ring Road, turning into the new M11 Moscow-St. Petersburg highway.

The remaining two sections - from Dmitrovsky to Yaroslavl highway and from Yaroslavskoye to Otkrytoye Highway - they are currently designing it.

Despite the fact that the chord is not yet completely ready, it has already made life much easier for millions of Muscovites. Let's talk about open areas.

From Businovskaya interchange to Dmitrovskoye highway

This large segment of the temporary storage warehouse included two areas: from Businovskaya Interchange to Festivalnaya Street and from Festivalnaya Street to Dmitrovskoye Highway.

The first was opened in 2015. It consists of 7.8 kilometers of roads, including 19 overpasses (4.45 kilometers), as well as a reconstructed pedestrian crossing.

Plot helped connect three districts: Khovrino, Golovinsky and Western Degunino. Before that, it was possible to drive between them only through the Moscow Ring Road, which greatly loaded the highway. In addition, this section helped to integrate the chord with the Moscow-St. Petersburg federal highway.

Second plot- from Festivalnaya Street to Dmitrovskoye Highway - opened on September 5th. It includes 10.6 kilometers of roads, including seven overpasses, a bridge over the Likhoborka River, an overpass on the connecting line of the Oktyabrskaya Railway and an underground pedestrian crossing. The site allows residents of the Golovinsky, Timiryazevsky and Koptevo districts to drive directly to Dmitrovskoye Highway without stopping at the Moscow Ring Road.

This is one of the most important segments of the chord, which will ensure the junction with Bolshaya Akademicheskaya Street and access to the North-West Chord. It will also allow the Moscow-St. Petersburg highway to exit through Dmitrovskoye Highway to the city center.



From Open Highway to Moscow Ring Road

The second part of the future chord stretched from the Open Highway to the eastern part of the Moscow Ring Road. It was divided during construction. into four sections: from Otkrytoye to Schelkovskoye Highway, from Schelkovskoye Highway to Izmailovsky Highway, from Izmailovsky Highway to Entuziastov Highway and from Entuziastov Highway to Moscow Ring Road.





Movement on five overpasses section from Shchelkovsky to Izmailovsky highway also already open. The total length of its roads is 13.38 kilometers, of which 1.48 kilometers are occupied by overpasses, another 480 meters are the tunnel under the Shchelkovo highway. The site helped to unload the Izmailovskoye and Shchelkovskoye highways, the Entuziastov highway and Budyonny Avenue, as well as Bolshaya Cherkizovskaya and Pervomaiskaya streets.

The section from the Izmailovsky highway to the Entuziastov highway- this is 22.84 kilometers of roads that opened in 2017. It included 15 overpasses, five pedestrian crossings and a reconstructed railway overpass. The road facilitated traffic on Budyonny Avenue and on the section of the Entuziastov Highway from Budyonny Avenue to Plekhanov Street. It also allowed to reduce the flow of vehicles that traveled to the city center along the Enthusiasts Highway. The site improved the transport accessibility of Sokolinaya Gora, Preobrazhenskoye, Vostochnoye and Severnoye Izmailovo districts.

Eastern end of the chord section from Entuziastov highway to MKAD opened September 4th. It will facilitate traffic in the east and southeast of the capital, reduce the load on Ryazan Avenue, Entuziastov Highway and Schelkovskoye Highway, as well as to the eastern sectors of the Moscow Ring Road and the Third Transport Ring (TTK). It will now be much easier for residents of the Kosino-Ukhtomsky and Nekrasovka districts, as well as Lyubertsy, to enter the city.

The segment included the longest overpass in Moscow— 2.5 kilometers from the Plushevo platform to the overpass-exit from Perovskaya Street.

During the construction of the road, pedestrian crossings were repaired: to the Vykhino metro station and the platform of the same name on the Kazan and Ryazan directions of the Moscow Railway, to the Assumption Church and the Veshnyakovskoye cemetery, to the Kuskovo park.





Crossing Moscow

The north-eastern chord will become one of the four new through highways of the capital. They decided to build them instead of the Fourth Ring Road, because such a system, according to experts,. The new transport framework, which will appear in Moscow before 2023, will be based on the North-Eastern, South-Eastern and North-Western chords, as well as the Southern Rocade.

New highways will connect the city districts and unload the Third Ring Road, the Moscow Ring Road and outbound highways. They will include about 300 kilometers of roads, 127 overpasses, bridges and tunnels, as well as more than 50 pedestrian crossings.

The North-Eastern chord will stretch from the M11 Moscow-St. Petersburg highway to an interchange at the intersection of the Moscow Ring Road with the Veshnyaki-Lyubertsy highway. It will connect major highways, as well as diagonally connect the north, east and southeast of the capital.

The section of the North-Eastern Expressway - from Festivalnaya Street to Dmitrovskoye Highway - will be completed by 2018. Its length is almost 11 kilometers, there will be many flyovers, overpasses and tunnels. Work on the new site is now in full swing. On Monday, Sergei Sobyanin visited the large-scale construction site.

Almost five kilometers of highway along the Oktyabrskaya railway. On the working scheme for the construction of the North-Eastern Expressway, this section is number 7. It will connect the existing exit to the Moscow-St. Petersburg highway with Dmitrovskoye Highway. The amount of work is enormous. Indeed, in addition to the construction of the roadway itself, it is necessary to shift kilometers of communications, reports.

By the beginning of construction here prepared thoroughly. The road will pass through the territory of a vast industrial zone. Dozens of buildings have to be demolished to make room. Car repair shops, warehouses, garage complexes- all this is removed to accommodate flyovers and overpasses. Even the pumping station, which serves the entire microdistrict, will be moved to the other side of the railway line. At the same time, consumers will not be turned off for a minute. Such preparatory work not only takes a lot of time, but also makes up a significant part of the budget.

"60 percent of our efforts and time will be spent on liberating the territory, transferring communications - these are heating mains, water supply, power lines, other underground, for example, cable collectors, we are going through, after that we will begin large-scale construction of the structures themselves," said the head of the construction department Moscow Andrey Bochkarev.

In total, more than 10 kilometers of roads will be built on this section. Most of will pass through overpasses and viaducts. The 170-meter bridge across the Likhoborka River will become one of the most complex engineering structures. Its width will make it possible to accommodate 11 lanes for traffic with access to a major road junction towards the Yaroslavl Highway.

"We have begun the most difficult part. road network Moscow. This connection toll road to St. Petersburg and Dmitrovka. We have already completed one section to Festivalnaya, now we have started the second section, which almost entirely consists of flyovers, overpasses, tunnels and a bridge. We hope that we will finish it in 2018," Sobyanin said.

However, some sections of the builders promise to hand over earlier. When ready. When the section from Festivalnaya to Dmitrovka is completed in its entirety, it will become part of the 35-kilometer North-Eastern chord. It will be a "first category" city highway. A multi-lane, traffic-free highway that will provide a diagonal connection between opposite districts of Moscow, while skirting the busy streets of the center.

Andrey Sidorenko, Vladimir Chernykh, Ilya Ushakov, "TV Center".

On October 2, Moscow Mayor Sergei Sobyanin inspected the progress of construction of the section of the North-Eastern Expressway from the Entuziastov Highway to the Moscow Ring Road. This section is scheduled to be completed in 2018.

traffic light highway

The route of the section of the North-Eastern chord from the Entuziastov highway to the Moscow Ring Road, which will be built in 2018, will run from the existing section of the chord at the intersection with the Entuziastov highway, then from the north side of the Ryazan direction of the Moscow Railway to the exit to the ring road.

In this section, the highway will be without traffic lights with three lanes in each direction thanks to five overpasses.

The new section of the North-Eastern Expressway from the Entuziastov highway to the Moscow Ring Road will in the future make it possible to redistribute traffic flows and reduce the load on outbound highways - Ryazansky Prospekt, Entuziastov Highway and Schelkovskoye Highway, as well as on the eastern sectors of the Moscow Ring Road and the Third Ring Road. Besides, new highway will significantly improve the transport situation in the southeast and eastern parts city, and will also simplify entry into Moscow for residents of the Kosino-Ukhtomsky and Nekrasovka districts and residents of Lyubertsy near Moscow.

In perspective new site chords will provide an understudy entry to Moscow federal highway"Moscow - Kazan".

Pedestrian accessibility

A new underground passage will be built near the Vykhino metro station. It will be located under the North-Eastern chord and will allow you to get to the subway from the direction of Veshnyakov. In addition to local residents, it will be used by those who come to the Vykhino station by land transport.

In addition, during the construction of the chord, two more existing underground passages will be reconstructed - in the area of ​​the Plyushchevo and Veshnyaki railway platforms.

Eco-chord

To local residents the sound of cars did not interfere, a three-meter noise screen will be installed along the route. Of course, cars will be heard, but not more than those that drive along the streets of the area.

Photo: Portal Moscow 24/Alexander Avilov

Noise screens from the chord will protect the Kuskovsky forest park.

Even when designing the chord section, the distance from the highway to the borders of the forest park was increased. This should protect the natural-historical object from the possible impact of construction. Also on this segment it is planned to limit the speed of movement.

In addition, it is planned to plant more than 200 mature trees, 1,800 shrubs, 134 thousand square meters of lawns and 500 square meters of flower beds next to the highway.

From East to North in half an hour

The entire North-Eastern chord will be about 35 km long. She will pass from new track M11 "Moscow - St. Petersburg" to the Kosinskaya flyover - interchange at the intersection of the Moscow Ring Road with the Veshnyaki-Lyubertsy highway. The route will connect major highways of the city: MKAD, Entuziastov highway, Izmailovskoe, Shchelkovskoe, Otkrytoe, Yaroslavskoe, Altufevskoe and Dmitrovskoe highways.

Thus, the North-Eastern Expressway will provide a diagonal connection between the north, east and south-east of the capital, reducing the traffic load on the center, the Third Ring Road, the Moscow Ring Road and outbound highways by about a quarter. In fact, the chord will become an alternate for the Moscow Ring Road and the Third Transport Ring (TTK).

The new North-Eastern chord will pass from the Oktyabrskaya railway (western) and will provide an entrance to the capital toll highway"Moscow, Saint Petersburg". The plan for the construction of new ones was approved in 2012. At the same time, the projects of both chords - both western and eastern - were agreed. At the same time, among other activities, the reconstruction of the intersection of Leningradsky Prospekt and Ul. Trade union with MKAD.

Highway location

Along the periphery, the North-Eastern chord should connect the northern and southeastern part capitals, that is, areas with the most densely populated populations.

In the east, in one part, it will go along the Moscow Ring Road. This road will connect such major highways as Schelkovskoye, Altufevskoye, Izmailovskoye and Otkrytoye. From the Businovskaya interchange, motorists will leave in two directions - to the northwest and northeast. At the same time, the Moscow Ring Road in the south will have to be expanded if the authorities decide to extend both chords to it. It is also possible that these highways will be connected southern rocade. This was announced back in 2012 by Deputy Mayor for Urban Planning Marat Khusnullin.

The north-eastern chord, firstly, will connect the capital with the western bypass of Odintsovo, and secondly, it will descend in the east to the Veshnyaki-Lyubertsy interchange. After that, it is planned to build a highway along which it will be possible to drive to Noginsk.

The project of the section of the chord from the sh. Enthusiasts to MKAD

A feature of the project of the North-East Chord is that it is being developed in parts.

In 2012, projects for sections were approved - from the Businovskaya interchange to the street. Festivalnaya and the overpass at the intersection of the street. Taldomskaya from the Oktyabrskaya railway. In 2013, the following competitions were announced:

  1. On the site from sh. Enthusiasts to the ring road.
  2. On the site from sh. Izmailovsky to sh. Shchelkovsky.

In the first case, the following activities were planned:

  1. Construction of an interchange at the intersection of the chord with the street. Kuskovskaya.
  2. The construction of a flyover at the intersection with the street. Youth.
  3. Construction of a pedestrian crossing in the place where the North-Eastern Expressway will approach the Moscow Ring Road.
  4. Reconstruction of the railway tracks of the Kazan and Gorky directions.
  5. The connection of the chord with the Veshnyaki-Lyubertsy interchange in the area of ​​​​the station "Highway of Enthusiasts" on the 8th kilometer of the Moscow Ring Road.

The plan also provided for the construction of pedestrian crossings in the following areas:

  1. Between Vostrukhina and Krasny Kazanets streets.
  2. Between the first Kazan glade and the alley of the First Mayevka.
  3. At the platform and exits (south and north) of the Vykhino metro station.
  4. Between Kuskovskaya glade and Maevok street.
  5. Between Karacharovsky highway and Kuskovskaya.

The length of this section was more than 8.5 km.

Project Schelkovskoye - Izmailovskoye Highway

The project included such activities as the construction of congresses:

  1. On Schelkovskoe highway towards the center.
  2. Through Tkatskaya Street to Okruzhnaya Proezd.
  3. On Okruzhnoy proezd in the direction of sh. Enthusiasts.
  4. From Shchelkovo highway towards Otkrytoye highway along the chord.

And also arrivals:

  • towards the open highway from the street. Soviet;
  • to Schelkovskoe highway from the street. Soviet towards the region;
  • from the 1st lane of the Izmailovsky menagerie.

This section of the North-East Chord is equipped with three flyovers. It is planned to build a tunnel with two lanes, two overground and eight

The triangle will replace the fourth transport ring

As already mentioned, it is possible that the two new highways North-East and North-West will be connected by the South Rokada. The latter will begin at the exit to New Riga, and then to the Aminevskoe highway. However, other projects are in development. In the event that the chords are stretched to the Moscow Ring Road, instead of the CTK, a triangle will turn out. The decision in this case will depend on which project will be cheaper. The disadvantage of transverse highways is that in recent times is clearly manifested in such a large metropolis as Moscow. For this very reason, the North-Eastern chord will be stretched through the entire city.

Travel on two overpasses of the exit, as well as on the railway overpass through the sh. Enthusiasts opened back in 2012. Among other things, a section of the main road was built, almost 2 km long. In total, the project covers about 25 km of roadway. The section of the CCT between sh. Enthusiastov and Izmailovsky should be put into operation in 2015.

Approximate cost of the project

It is assumed that the construction of the North-Eastern Expressway will cost the Moscow authorities 70 billion rubles. Khusnullin said back in August last year that the costs could amount to no more than 30-35 billion rubles.

The authorities had to find the optimal balance between cost and throughput future highway. In the event that it is built a large number of various kinds of artificial objects, the track will become faster, but also more expensive.

Competition: section from Shchelkovsky highway to Otkrytoye

At the beginning of this year, two overpasses were opened on the interval from the Entuziastov highway to Izmailovsky. The tender for the construction of the next section was announced in December 2013. Its results were summed up in early March of this year. It is planned to build at least three or four lane highways in one direction only. The road will run along the MK MZhD from Schelkovo highway to the street. Losinoostrovskaya. The length of the section will be 3.2 km. This is approximately 10% of the total. According to the project, the following activities will also be carried out on this site:

  • construction of a transport interchange in the area of ​​​​the intersection of the chord with the Open Highway;
  • construction of two ramps to Otkrytoye Highway with outside highways;
  • arrangement of passage under the Mytishchi overpass with the possibility of a U-turn.

In order for motorists to have the opportunity to exit the Shchelkovo highway onto the chord towards the center, an overpass will be built. There are plans to build another one in the future. A right-turn exit will also be organized to Losinoostrovskaya Street.

After the construction is completed, the North-Eastern Chord, the scheme of which is presented a little higher, will connect many important areas of the city. In 2014 on road construction 90 billion rubles have been allocated in the capital. At the same time, it is planned to put into operation 76.6 km of newly built and reconstructed roads.