Technological regulations for waste management sample. Development of technological regulations for the management of construction waste

PROJECT OF WORK PRODUCTION

DRAFT TECHNOLOGICAL REGULATIONS FOR CONSTRUCTION WASTE MANAGEMENT

"AGREED"

Committee for Nature Management,
environmental protection
and ensuring environmental safety

For registry N ____________________________

"___"_______________ 2012

___________________________________
(Full name, signature of the official)

Object of construction waste generation:

Reclamation of earthen masses at the address: St. Petersburg, Dinamovskiy Ave., 384, letters X, Y, Z.


Customer for the production of works at the facility:

Legal address:

Actual address:

Contact number:


General contractor:

Legal address:

Actual address:

Contact number:


Regulation developer:

Legal address:

Actual address:

Contact number:

Chief Project Engineer

Table N 1

LIST OF CONSTRUCTION WASTE GENERATED ON THE FACILITY

Hazard Class
(I-V)

Quantity

IV hazard class

Hazard class V

TOTAL

CHARACTERISTICS OF THE TEMPORARY STORAGE OF CONSTRUCTION WASTE ON THE SITE

Table No. 2

Reclamation of earthen masses at:

St. Petersburg, pr.Dinamovskiy, 384, letters X, Y, Z

Name of generated construction waste

Hazard Class

Purpose of accumulation

Characteristics of the place of temporary storage of construction waste

Construction waste storage area

Number on the object diagram

Area, m

Type of arrangement

Capacity, m/t

Storage method

Garbage from household premises of organizations, unsorted

Construction site

Concrete plates

Container

Waste (sludge) from mechanical and biological wastewater treatment (sludge from treatment facilities for washing vehicle wheels)

Transfer of a licensed organization for waste disposal of III-V hazard class

Construction site

Concrete plates

Container

Soil formed during excavation, not contaminated with hazardous substances

Transfer of a licensed organization for waste disposal of III-V hazard class

Construction site

open area

open area

Note: The designation of all places of temporary storage of generated construction waste named in column 5 is given in the "Scheme of disposal of construction waste at the construction site".

REMOVAL OF CONSTRUCTION WASTE FROM THE FACILITY TERRITORY

Table No. 3

Reclamation of earthen masses at:

St. Petersburg, pr.Dinamovskiy, 384, letters X, Y, Z

Name of construction waste

Hazard Class

Amount of construction waste, m/t

Frequency of removal from the territory of the object

Construction waste carrier

Recipient of construction waste

Garbage from household premises of organizations, unsorted

0,367/0,067

Weekly

Licensed organization for the transportation of waste of III-V hazard class

Licensed organization for waste disposal of III-V hazard class

Waste (sludge) from mechanical and biological wastewater treatment (sludge from treatment facilities for washing vehicle wheels)

0,0071/0,01

Weekly

Soil formed during excavation, not contaminated with hazardous substances

4273,9/5983,46

Daily

Notes:

Attached to this table are:

- copies of contracts with the carrier of construction waste from the territory of the facility,

- copies of contracts with the recipient of construction waste,

- licenses of carriers and recipients of construction waste to handle hazardous waste.

In the contracts, indicate the full name of the construction waste carrier (column 6), legal and actual addresses, contact phone number, contract number, the name of the construction waste recipient, legal and contact phone number, contract number, on the basis of which construction waste is removed.

In the contracts indicate (column 7) the full name of the recipient of construction waste, legal and actual address, contact phone number, contract number, on the basis of which construction waste is accepted; processing, use, neutralization, burial.

SCHEME OF CONSTRUCTION WASTE DISPOSAL ON THE CONSTRUCTION SITE

Fig.1. Stroygenplan M 1:5000

GENERAL PROVISIONS

1. Draft technological regulation for the handling of construction waste was developed in order to streamline actions with construction waste and defines uniform requirements for the management of construction waste generated in the process of reclamation of earth masses at the address: St. Petersburg, Dinamovskiy Ave., 384, letters X, Y, Z.

2. The draft technological regulation for the management of construction waste was developed in accordance with the architectural and planning task, regulatory requirements for project documentation, as well as the following regulatory documents:

- On the entry into force of SP 2.1.7.1386-03 (as amended as of March 31, 2011), SP 2.1.7.1386-03 Sanitary rules for determining the hazard class of toxic production and consumption wastes.

- GOST R 51769-2001 Resource saving. Waste management. Documentation and regulation of activities for the treatment of production and consumption waste. Basic provisions (with Amendment No. 1).

- Amendment N 1 GOST R 51769-2001 Resource saving. Waste management. Documentation and regulation of activities for the treatment of production and consumption waste. Basic provisions.

- GOST R 53691-2009 Resource saving. Waste management. Passport of waste I-IV hazard class. Primary requirements.

- On approval of SP 2.1.7.2570-10 Amendment No. 1 to SP 2.1.7.1386-03 "Sanitary rules for determining the hazard class of toxic production and consumption wastes".

- GOST R 53692-2009 Resource saving. Waste management. Stages of the technological cycle of waste.

- On the introduction of sanitary and epidemiological rules and regulations SanPiN 2.1.7.1322-03 Hygienic requirements for the placement and disposal of production and consumption waste.

- On approval of SP 2.1.7.2850-11 "Changes and additions No. 2 to SP 2.1.7.1386-03 "Sanitary rules for determining the hazard class of toxic production and consumption wastes" .

- GOST R 54096-2010 Resource saving. Waste management. Relationship between the requirements of the Federal Classification Catalog of Waste and the All-Russian Classification of Products.

- On the approval of SanPiN 2.1.7.2790-10 "Sanitary and epidemiological requirements for the treatment of medical waste".

- GOST R 54098-2010 Resource saving. Secondary material resources. Terms and Definitions.

- GOST R ISO 14050-2009 Environmental management. Dictionary.

- GOST R 52108-2003 Resource saving. Waste management. Basic provisions (with Amendment No. 1).

- GOST R 54259-2010 Resource saving. Waste management. Standard Guide for Waste Reduction, Resource Recovery, and the Use of Recycled Plastic Materials and Products.

- Amendment N 1 GOST R 52108-2003 Resource saving. Waste management. Basic provisions.

- About the implementation sanitary regulations, SP 2.1.7.1038-01 Hygienic requirements for the arrangement and maintenance of landfills for municipal solid waste.

- GOST R 17.0.0.06-2000 Nature Protection. Ecological passport of the nature user. Basic provisions. Standard forms.

- MDS 13-8.2000 The concept of solid waste management in Russian Federation.

- On putting into effect sanitary rules SP 2.6.6.1168-02 "Sanitary rules for handling radioactive waste (SPORO-2002)" (as amended on December 23, 2010).

- GOST R 54205-2010 Resource saving. Waste management. Best Available Techniques for Increasing Energy Efficiency in Combustion.

- GOST R 14.01-2005 Environmental management. General provisions and objects of regulation.

- MDS 12-46.2008 Guidelines for the development and execution of a construction organization project, a project for the organization of demolition (dismantling) work, a project for the production of works.

- On approval of SanPiN 2.6.6.2796-10 "Sanitary rules for radioactive waste management (SPORO-2002). Amendments and additions No. 1 to SP 2.6.6.1168-02".

- MU 2.1.7.1185-03 Collection, transportation, disposal of asbestos-containing waste.

3. The generator of construction waste is a general contracting organization that performs the reclamation of earth masses. Basic information about the generator of construction waste is presented in Appendix N 1.

4. The object of generation of construction waste is a construction site at the address: St. Petersburg, Dinamovskiy Ave., 384, letters X, Y, Z. Basic information about the object of generation of construction waste is given in Appendix No. 1.

5. Technological processes of building construction, during which construction waste is generated, are given in the project for the production of works. The list of volumes of the main construction and installation works is given in Appendix No. 2. The list of basic building materials is given in Appendix No. 3. Necessary calculations and justifications for the amount of generated construction waste are given in Appendix No. 4.

6. Collection, temporary storage, accounting, transfer for processing of construction waste are carried out at the sites of construction waste generation. The generator of construction waste is responsible for the collection, temporary storage and accounting of construction waste.

7. Collection of construction waste is carried out separately according to the methods of further disposal, hazard classes, flammability and other features in order to ensure processing, use as secondary raw materials, neutralization, burial. The list of construction waste generated at the facility is given in Table No. 1.

8. Places for temporary storage of construction waste must be equipped in such a way as to exclude contamination of the soil, surface and ground waters, atmospheric air. Temporary storage of construction waste is carried out in containers or on open storage areas specially equipped for this purpose, shown on the "Scheme of storage and removal of construction waste".

9. The maximum amount of accumulation of construction waste at the objects of their formation, the terms and methods of their storage are established in accordance with environmental requirements, sanitary norms and rules, as well as rules fire safety. The characteristics of the places for temporary storage of construction waste at the facility are given in Table No. 2.

10. Construction waste is removed from the construction site by road. Movement (transportation) of construction waste should be carried out in ways that exclude the possibility of their loss during transportation, the creation of emergency situations, causing harm to the environment, human health, economic and other objects. Responsibility for compliance with these requirements lies with the carriers of construction waste.

11. Recipients of construction waste are specialized enterprises: territories, landfills solid waste, where processing, use, and, if necessary, neutralization, disposal of construction waste is carried out.

Construction waste must be sent for processing, use or neutralization, subject to the availability of appropriate processing enterprises in St. Petersburg; territories, the dumping or reclamation of which with the specified waste is allowed in accordance with the project.

Construction waste, the processing, use or disposal of which is temporarily impossible due to the lack of relevant enterprises and territories in St. Petersburg, should be buried at solid waste landfills with waste disposal limits.

The frequency of removal of construction waste from the territory of the facility is determined in accordance with environmental requirements, sanitary norms and rules, as well as fire safety rules, the capacity of places for temporary storage of construction waste at the facility, the volume and carrying capacity of vehicles. Data on the removal of construction waste from the territory of the facility are given in Table No. 3.

12. Accounting for the generated, transferred for processing, use, neutralization, disposal of construction waste is carried out in the register of temporary storage and disposal (removal) of construction waste, the form of which is given in Appendix No. 5.

13. The generator of construction waste fills in the certificate of delivery of construction waste and transfers it to the carrier of construction waste.

The form of the act of delivery of construction waste sent for processing, use, neutralization, burial is given in Appendix No. 6.

14. When accepting construction waste from the carrier of construction waste or the generator of construction waste, the recipient of construction waste shall fill in a tear-off control coupon and hand it over to the carrier of construction waste for subsequent transfer to the generator of construction waste. The act of delivery of construction waste remains with the recipient of construction waste for accounting of accepted construction waste.

15. Upon completion of the removal of construction waste from the object of generation of construction waste, the generator of construction waste, on the basis of the data of tear-off control coupons, draws up with each recipient of construction waste a certificate of delivery and acceptance of construction waste. The certificate is submitted to the Committee for the Use of Natural Resources, Environmental Protection and Ensuring Ecological Safety in order to draw up a conclusion on compliance with the regulations. The form of certificate of delivery and acceptance of construction waste is given in Appendix No. 7.

16. The State Administrative and Technical Inspectorate closes the permit for the performance of work if there is an opinion of the Committee for Nature Management, Environmental Protection and Environmental Safety on the performance of work in accordance with the regulations.

17. Generators of construction waste are required to have concluded agreements with carriers and recipients of construction waste, or produce on their own in the presence of appropriate licenses for the movement (transportation), processing, use, disposal of construction waste.

18. Processing, use, neutralization, burial of construction waste is carried out in accordance with construction, sanitary standards and rules, current legislation.

Movement (transportation), processing, use, neutralization, disposal of construction waste I-IV hazard classes is carried out only if there is a license for activities with hazardous waste.

Appendix No. 1

Annex N 1. GENERAL INFORMATION

Details of the enterprise-customer

Legal address

Actual address

Director

Phone number

Contact person, phone number

Details of the design organization

Legal address

Actual address

Director

Phone number

Contact person, phone number

N license

Details of the contractor

Legal address

Actual address

Director

Phone number

Contact person, phone number

N contract-contract

The company responsible for waste disposal during the construction period

N contracts for waste disposal

Organization


Information about the building site (construction works)

Plot address

St. Petersburg, pr.Dinamovskiy, 384, letters X, Y, Z

Territory balance

Index

For the period of construction

Land area

Architectural planning and design solutions

The object is located in the Petrogradsky district of St. Petersburg at ________________ at the address: _________________.

The territory has been prepared for the reclamation of earth masses, old buildings have been dismantled, road surfaces have also been dismantled. For dismantling work, a "Draft technological regulation for the handling of construction waste" was developed and approved in the prescribed manner.

Before leaving the construction site, all vehicles must pass through the washing of the wheels of construction vehicles, arranged near the exit gate. Waste water after washing cars must, before being discharged into the sewerage network, be cleaned in an oil and gasoline sump.

Number of workers on site

Appendix N 2. SCOPE OF VOLUME OF THE BASIC CONSTRUCTION AND ASSEMBLY AND DISMANTLING WORKS

Appendix No. 2

Name of works

Scope of construction, installation and dismantling works

Completed:

N.V. Lokatarev

Checked:

S.M. Smirnov

Annex N 3. CALCULATION OF THE VOLUME OF CONSTRUCTION WASTE

Appendix No. 3


A) WHEN PERFORMING BASIC CONSTRUCTION AND ASSEMBLY AND DISMANTLING WORKS

Material name

Waste rate per unit. rev.

Waste volume

Number of the storage site on the object scheme

Classifier number

Calculation-
ny, m

Removal of reclamation soil in the excavation from the facility

314 011 00 08 99 5

Soil formed during excavation, not contaminated with hazardous substances


B) CALCULATION OF HOUSEHOLD WASTE

Garbage from household premises of organizations, unsorted ( 91200400 01 00 4 ).

Education standard household waste, formed as a result of the life of builders during the reclamation of earth masses, is determined by the formula:

Where - the number of workers in construction, people;

Specific rate of generation of household waste per 1 builder per year, kg/year;

- duration of construction in years.

The calculation of waste generation is presented in tabular form

Construction duration

Number of construction workers

Name

Domestic waste accumulation rate

Annual accumulation of household waste

Accumulation of household waste during the construction period

Note


Number of containers is determined by the formula:

Where is the mass of household waste generated during the reclamation period per year. 0.4 t/year;

[email protected]

If the payment procedure on the website of the payment system has not been completed, cash
funds will NOT be debited from your account and we will not receive confirmation of payment.
In this case, you can repeat the purchase of the document using the button on the right.

An error has occurred

The payment was not completed due to a technical error, cash from your account
were not written off. Try to wait a few minutes and repeat the payment again.

About waste management

THE GOVERNMENT OF MOSCOW

RESOLUTION

About waste management
construction and demolition in Moscow


Withdrawn from control due to implementation on the basis of
Decrees of the Government of Moscow
dated December 30, 2003 N 1096-PP
_____________________

____________________________________________________________________
Document as amended by:
Decree of the Government of Moscow of January 28, 2003 N 33-PP (Bulletin of the Mayor and the Government of Moscow, N 9, 07.02.2003);
Decree of the Government of Moscow of February 17, 2004 N 88-PP (Bulletin of the Mayor and the Government of Moscow, N 14, 03.03.2004);
Decree of the Government of Moscow of July 11, 2006 N 500-PP (Bulletin of the Mayor and the Government of Moscow, N 43, 02.08.2006);
Decree of the Government of Moscow of July 25, 2006 N 566-PP (Bulletin of the Mayor and the Government of Moscow, N 46, 16.08.2006).
(Official website of the Mayor and the Government of Moscow, www.mos.ru, 13.03.2013).
____________________________________________________________________

In the course of construction work in the city of Moscow, more than one and a half million tons of construction and demolition waste are generated annually, which are valuable secondary raw materials, and in accordance with the basic principles public policy in the field of waste management, set out in, should be recycled, used and brought into economic circulation in order to reduce the amount of waste.

In order to provide legal conditions for a more complete use of construction and demolition waste in Moscow and reduce their generation, a unified procedure for handling this category of waste in the city is being introduced.

In accordance with Federal Law No. 89-FZ of June 24, 1998 "On Production and Consumption Waste", Decrees of the Government of Moscow of November 9, 1999 No. 1018 "On Approval of the Rules for Sanitary Maintenance of Territories, Organization of Cleaning and Ensuring Cleanliness and Order in Moscow" , dated 01/25/2000 N 49 "On approval of the Norms and rules for design, planning and development of Moscow MGSN 1.01-99", as well as by order of the First Deputy Prime Minister of the Government of Moscow dated 05/31/2000 N 424-RZP "On the implementation of the Integrated Environmental Program of Moscow regarding the use of waste in the form of secondary resources for the construction industry of the city" Government of Moscow
Decree of the Government of Moscow dated March 6, 2013 N 129-PP.

decides:

1. Approve and put into effect from 08/01/2002 the procedure for handling construction and demolition waste in Moscow, in accordance with Appendix 1.

2. Determine that the design and estimate documentation approved before the entry into force of the Procedure for the management of construction and demolition waste in Moscow (hereinafter referred to as the Procedure) is not subject to revision.

3. The clause became invalid - Decree of the Government of Moscow dated July 25, 2006 N 566-PP ..

4. The paragraph became invalid from July 1, 2013 - ..

5. Assign the functions of maintaining a data bank of construction and demolition waste in the city of Moscow to the State Treasury Institution of the City of Moscow "Department of Territory Preparation" (hereinafter referred to as GKU "UPT").
Decree of the Government of Moscow dated March 6, 2013 N 129-PP.

6. The clause became invalid on July 1, 2013 - Decree of the Government of Moscow dated March 6, 2013 N 129-PP ..

7. The clause became invalid on July 1, 2013 - Decree of the Government of Moscow dated March 6, 2013 N 129-PP ..

8. The clause became invalid on July 1, 2013 - Decree of the Government of Moscow dated March 6, 2013 N 129-PP ..

9. The clause became invalid on July 1, 2013 - Decree of the Government of Moscow dated March 6, 2013 N 129-PP ..

10. Control over the implementation of this resolution shall be entrusted to the Deputy Mayor of Moscow in the Government of Moscow for urban planning policy and construction Khusnullin M.Sh.".
(Paragraph as amended, put into effect on July 1, 2013 by Decree of the Government of Moscow dated March 6, 2013 N 129-PP.

Mayor of Moscow
Yu.M. Luzhkov

Appendix 1. Procedure for handling construction and demolition waste in Moscow

This document establishes a unified procedure for handling construction and demolition waste in the city of Moscow.

The requirements of this Procedure are mandatory for all legal entities and individual entrepreneurs, in the process economic activity which in the territory of Moscow generate construction and demolition waste, as well as legal entities and individual entrepreneurs engaged in the transportation, disposal or use of construction and demolition waste.

Terms and definitions used in this Procedure.

Construction and demolition waste - waste (with the exception of highly and extremely hazardous) from the demolition, dismantling, reconstruction, repair or construction of buildings, structures, utilities and industrial facilities, combined into a single group;

Dimensional construction and demolition waste (GSO) - waste that can be loaded into a standard bunker - a storage tank with a volume of more than 2.0 cubic meters;

Oversized Construction and Demolition Waste (ODS) - waste that cannot be loaded into a standard storage hopper with a volume of more than 2.0 cubic meters due to its size and nature;

Waste producers - legal entities and individual entrepreneurs, in the course of their economic activities in the territory of Moscow, construction and demolition waste is generated;

Waste generation facility - a construction site or a site for construction and installation works, where construction and demolition waste is generated;

Waste processors - legal entities and individual entrepreneurs engaged in the processing and use of waste;

Waste carriers - legal entities and individual entrepreneurs engaged in the movement (transportation) of waste;

Waste recipients - final recipients of waste removal (disposal), which include waste processors and persons operating waste disposal facilities;

Temporary storage of construction and demolition waste - the content of waste in specially equipped places for storage for the purpose of their subsequent use, disposal or neutralization for a period not exceeding 7 calendar days;

Secondary products - products (materials) obtained in the process of waste processing;

Technological regulations for the process of handling construction and demolition waste (TR) - a document regulating the process of handling generated construction and demolition waste for each specific object of their formation. TR as a separate section is included in the design documentation for the construction and reconstruction of such an object.

Requirements for the management of construction and demolition waste.

In accordance with the basic principles of the state policy in the field of waste management, set out in the Federal Law of June 24, 1998 N 89-FZ "On Production and Consumption Wastes" and focused on increasing the degree of waste disposal and increasing the share of using secondary resources, the waste group construction industry(construction and demolition waste), as the one that most fully meets the above principles, should be recycled and reused to the maximum extent possible.
(Paragraph as amended, put into effect on July 1, 2013 by Decree of the Government of Moscow dated March 6, 2013 N 129-PP.

1. General requirements

1.1. Construction and demolition waste according to the items specified in Annex 2 to the Procedure should be sent for processing and further use, subject to mandatory radiation and sanitary and hygienic control of waste and products of their processing, as well as the availability of appropriate processing facilities in the city of Moscow.

Construction and demolition waste, the processing of which is temporarily not possible due to the lack of appropriate capacities in the city of Moscow, should be used to fill in exhausted quarries and other inconveniences included in the duly approved list of urban construction and demolition waste disposal facilities located in the Moscow region.

1.2. The collection of construction and demolition waste is carried out at the objects of their formation separately (differentiated) according to the totality of positions that have a single direction of use, specified in Appendix 2 to the Procedure.

The collection of waste sent for disposal and disposal is carried out separately according to hazard classes.

1.3. Responsibility for the collection and sorting of waste at the objects of their generation is borne by waste producers.

1.4. At construction and demolition waste generation sites, only temporary storage (storage) of construction and demolition waste is allowed, and only in places specially equipped for this (the requirements for equipping places for temporary storage (storage) of construction and demolition waste are set out in clause 3 of the Procedure).

The paragraph became invalid on July 1, 2013 - Decree of the Government of Moscow dated March 6, 2013 N 129-PP ..

1.5. In order to ensure the process of handling construction and demolition waste, the waste producer is obliged to have concluded agreements with contractors for the process of handling construction and demolition waste: waste carriers, waste processors or persons operating waste disposal facilities (clause 1.1 of the Procedure) and having licenses and limits on waste disposal .

1.6. The process of handling construction and demolition waste for each specific object of education is determined by the technological regulations for the process of handling construction and demolition waste. Requirements for registration of TR are set out in clause 2 of the Procedure.

1.7. The cost of contractors' work on the construction and demolition waste management process, as well as the cost of work on the development of technological regulations, is included in the estimated cost of construction, repair and reconstruction according to the standards, prices and in the manner approved by the Regional Interdepartmental Commission on Price and Tariff Policy under the Government of Moscow .

1.8. Maintaining a database of construction and demolition waste:

1.8.1. Maintaining a data bank of construction and demolition waste in Moscow is carried out by the GKU "UPT.
(Clause 1.8.1 as amended, put into effect on July 1, 2013 by Decree of the Government of Moscow dated March 6, 2013 N 129-PP.

1.8.2. Functions for maintaining a data bank of construction and demolition waste in Moscow:

Maintaining a register of actually generated, used or buried construction and demolition waste in Moscow;

Registration of all developed technical specifications with the assignment of an individual registry number to each of them;

Providing the data of the register of actually generated, used or buried construction and demolition waste in Moscow to the executive authorities of the city of Moscow at their request free of charge;

Analysis current state and long-term forecasting in the field of construction and demolition waste management in Moscow;

Development of recommendations for the creation, development or modernization of production facilities for the processing of construction and demolition waste in the city of Moscow;
(The hyphen in the wording put into effect on July 1, 2013 by the Decree of the Government of Moscow of March 6, 2013 N 129-PP.

Development and implementation of a system for involving secondary construction products in economic circulation;

The hyphen became invalid on July 1, 2013 - by Decree of the Government of Moscow dated March 6, 2013 N 129-PP;

Verification of the compliance of the process of practical implementation of the TR provisions.

2. The procedure for the development and registration of technological regulations for the process of handling construction and demolition waste.

2.1. All waste producers, regardless of their form of ownership and departmental affiliation, are required to have technical and technological documentation regulating the process of handling construction and demolition waste generated by them in the form of technological regulations.

TR must reflect complete and reliable information on the entire process of construction and demolition waste management from the moment of their formation to the moment of their use or disposal (a typical form of TR is presented in Appendix 1 to the Procedure).

The TR takes into account the most efficient ways of using construction and demolition waste to maximize their involvement in secondary circulation as secondary raw materials or secondary materials suitable for use in construction and municipal services, and taking into account the optimal routes for their transportation to places of processing, disposal and disposal at specialized enterprises that have the appropriate capacities, licenses and limits for the disposal of construction waste.
(The paragraph is additionally included from July 1, 2013 by Decree of the Government of Moscow dated March 6, 2013 N 129-PP)

2.2. TR for buildings under construction, repaired, reconstructed, dismantled, demolished buildings, structures or industrial facilities is developed separately for each object of construction and demolition waste generation at the stage of preparation of project documentation (paragraph as amended by Decree of the Government of Moscow dated July 11, 2006 N 500-PP.

2.3. TR development:

2.3.1. The development of TR is carried out by organizations identified in the prescribed manner by the customers of construction (hereinafter referred to as the developers), in accordance with the terms of reference for the development of TR.
(Clause 2.3.1 as amended, put into effect on July 1, 2013 by Decree of the Government of Moscow dated March 6, 2013 N 129-PP.

2.3.2. The development of TR is carried out according to a standard form (Appendix 1 to the Procedure).

2.3.3. Measures for the placement and use of construction and demolition waste, included in the developed TR, must reflect complete and reliable information, meet current sanitary and environmental requirements, as well as the principles of the most complete use of secondary raw materials (waste).

2.3.4. The clause became invalid on July 1, 2013 - Decree of the Government of Moscow dated March 6, 2013 N 129-PP ..

2.4. TR registration:

2.4.1. TR is mandatory to be registered with an organization that maintains a data bank of construction and demolition waste in Moscow (clause 1.8.1 of the Procedure).

2.4.2. When registering a TR, an organization that maintains a database of construction and demolition waste in the city of Moscow analyzes the information contained in it and, if it complies with the provisions and requirements of this Procedure, assigns an individual registration number to the TR.
(Clause 2.4.2 as amended, put into effect on July 1, 2013 by Decree of the Government of Moscow dated March 6, 2013 N 129-PP.

2.4.3. The data presented in the TR are entered into the register of construction and demolition waste in Moscow.

2.4.4. The deadline for registration of a TR is 2 business days (excluding the day the TR is submitted for registration).

2.4.5. The provisions on construction and demolition waste management reflected in the TR are binding on both the waste producer and the contractors involved by him to perform work on the process of construction and demolition waste management.

2.5. TR registration does not apply to the category of paid works (services) of an organization that maintains a data bank of construction and demolition waste in Moscow.

2.6. Starting from August 1, 2002, a registered TR must be submitted without fail:

Mosgosexpertiza and the Department of Nature Management and Environmental Protection of the Government of Moscow - at the stage of consideration and approval of project documentation;

The Association of Administrative and Technical Inspections of the Government of Moscow - at the stage of issuing an order for work.

2.7. Without providing (clause 2.6 of the Procedure) a properly executed TR:

Mosgosexpertiza and the Department of Nature Management and Environmental Protection of the Government of Moscow do not accept project documentation for consideration and approval;

The Association of Administrative and Technical Inspections of the Government of Moscow does not issue or renew work orders.

2.8. The verification of the compliance of the process of practical implementation of the TR provisions is carried out by the Department of Construction of the City of Moscow.
(Clause 2.8 as amended, put into effect on July 1, 2013 by Decree of the Government of Moscow dated March 6, 2013 N 129-PP.

2.9. Control over the process of implementation of the TR is carried out by the Department of Nature Management and Environmental Protection of the Moscow Government, the sanitary and epidemiological supervision bodies and the Association of Administrative and Technical Inspections of the Moscow Government in accordance with their powers.

3. Collection and temporary storage of construction and demolition waste.

3.1. Waste producers are required to separate collection(sorting) and temporary storage (storage) of construction and demolition waste subject to processing and further use, according to the totality of items having a single direction of use (Appendix 2 to the Procedure), as well as separate collection and temporary storage (storage) of construction and demolition waste, to be disposed of by hazard class.

3.2. Separate collection (sorting) of the resulting construction and demolition waste should be carried out mainly in a mechanized way.

Manual sorting of the resulting construction and demolition waste is allowed, provided that the current sanitary standards, environmental requirements and safety regulations are observed.

3.3. The deadline for keeping generated construction and demolition waste in temporary storage (warehousing) sites should not exceed 7 calendar days.

3.4. Places of temporary storage (storage) of construction and demolition waste (hereinafter referred to as storage places) must meet the following requirements:

Storage sites should be located directly on the territory of the construction and demolition waste generation facility or in its immediate vicinity on the site leased by the waste producer for the specified purposes from the owner (user) of such a site;

The size (area) of the storage site is determined by calculation, which allows distributing the entire volume of temporary storage of the resulting construction and demolition waste over the area of ​​the storage site with a load of not more than 3 t/sq.m;

Storage areas must have a fence along the perimeter of the site in accordance with GOST 25407-78 "Inventory fences for construction sites and sites for construction and installation works";

Storage areas must be equipped in such a way as to exclude pollution by construction and demolition waste of the soil and topsoil;

Lighting of storage areas at night must meet the requirements of GOST 12.1.046-85 "Normals for lighting construction sites";

The placement of waste in storage areas should be carried out in compliance with the current environmental, sanitary, fire safety standards and safety regulations, as well as in a way that ensures the unhindered loading of each individual position of construction and demolition waste onto vehicles for their removal (removal) from the territory of the construction waste generation facility and demolition;

For separate storage of large-sized construction and demolition waste (according to positions, hazard classes and subsequent purpose: processing, burial or neutralization), storage sites must be equipped with storage bins with a volume of at least 2.0 cubic meters in the required quantity;

Separate storage of oversized waste (NGSO) that is not hazardous is carried out in open areas of storage sites;

Access to storage sites should be excluded for unauthorized persons who are not related to the process of waste handling or control over this process.

3.5. The waste producer maintains a log of the placement of construction and demolition waste in storage areas and their removal (removal) from the formation facilities in the form below:

LOGBOOK
placement in places of temporary storage
and removal (removal) of construction and demolition waste

the date
education

Name
waste positions

Class
danger

Volume
education
(cubic meters)

the date
export

Name
waste carrier

Destination
(Name,
location)

To the data in column 7, after the completion of the event for the removal of construction and demolition waste, accompanying coupons for construction and demolition waste (sample coupon - Appendix 3 to the Procedure), marked by the waste recipients, are attached.

3.6. The waste producer is responsible in accordance with the procedure established by the current legislation for compliance with environmental, sanitary and fire safety standards during the collection and temporary storage of construction and demolition waste, as well as for accounting for the resulting construction and demolition waste and the safety of their properties as secondary raw materials during the entire period of temporary storage construction and demolition waste.

4. Transportation of construction and demolition waste.

4.1. Removal (removal) of construction and demolition waste from the objects of formation and storage sites is carried out by the waste producer itself, or by waste carriers with whom the waste producer has concluded a contract for waste removal.

4.2. Motor vehicles involved in the transportation of oversized construction and demolition waste in bulk must meet the requirements approved.

4.3. Construction and demolition waste storage bins that are not equipped with a lid must be equipped with an awning when they are moved. For tent shelters of storage bunkers, requirements similar to those set out in. Waste carriers are responsible for equipping the exported storage bins with tent shelters.

4.4. The removal of construction and demolition waste from waste generation facilities and storage sites should be carried out according to the most optimal transport schemes and routes.

4.5. The waste disposal destination for the waste carrier and transport schemes for the movement of waste (in accordance with TR) are determined by the waste producer.

4.6. The waste carrier is obliged:

Comply with the general requirements for carriers;

Clearly follow the instructions of the waste producer regarding the destination for the removal of construction and demolition waste;

When proceeding to the specified destination for the removal of construction and demolition waste, if possible, adhere to transport schemes movement of construction and demolition waste included in the TR and with which he was familiarized by the waste producer;

Upon delivery of waste to the waste recipient, issue given fact and receive from the waste recipient the accompanying coupon of construction and demolition waste marked by him;

After the completion of the voyage, immediately hand over the accompanying coupon for construction and demolition waste, marked by the waste recipient, to the waste producer.

4.7. Control over the fulfillment by waste carriers of their contractual obligations under contracts with the waste producer, as well as accounting for the waste actually handed over to the waste recipient, is carried out by the waste producer.

5. Burial of construction and demolition waste.

5.1. The procedure and rules for the disposal of construction and demolition waste not subject to processing and further use are regulated by the rules and norms for the disposal of production and consumption waste established by current legislation.

5.2. Persons operating facilities for the disposal of construction and demolition waste must have appropriate permits (standards and placement limits) for waste disposal.
(Clause 5.2 as amended, put into effect on July 1, 2013 by Decree of the Government of Moscow dated March 6, 2013 N 129-PP.

5.3. Facilities used for disposal of construction and demolition waste must meet environmental requirements.

5.4. Waste disposal for disposal at facilities operated by persons who do not have appropriate permits and do not meet environmental requirements is not allowed.

5.5. When accepting construction and demolition waste from a waste carrier or waste producer, persons operating facilities for the disposal of construction and demolition waste must note the accompanying coupon for construction and demolition waste (Appendix 3), indicating the name and amount of waste handed over to them.

The voucher, marked by persons operating construction and demolition waste disposal facilities, is handed over to the waste carrier for subsequent transfer to the waste producer. A copy of the coupon remains with the persons operating the facilities for the disposal of construction and demolition waste and is filed in the register of waste accepted for burial.

6. Recycling and further use of construction and demolition waste

6.1. List of construction and demolition waste (by subgroups and positions) subject to mandatory processing, as well as priority areas their use for the production of secondary products for construction purposes are defined in Appendix 2 to the Order.

6.2. Enterprises that process construction and demolition waste, and industrial installations used in such processing, must comply with current environmental and sanitary standards.

6.3. When accepting construction and demolition waste from a waste carrier or waste producer, waste processors must note the accompanying coupon for construction and demolition waste (Appendix 3 to the Procedure), indicating the name and amount of waste handed over to them.

The coupon, marked by the waste processors, is handed over to the waste carrier for subsequent transfer to the waste producer. A copy of the coupon remains with the waste processor and is filed in the register of waste accepted for processing.

6.4. The acquisition of property rights of the parties to waste processing products (secondary products) is carried out in the manner prescribed by Article 220 of the Civil Code of the Russian Federation.

6.5. The current standards, SNiP 21-01-97, and the "Rules for the sanitary and hygienic assessment of building materials with the addition of industrial waste" (MU 2.1.674-97) apply to secondary products obtained in the process of processing construction and demolition waste.

Secondary products obtained in the process of processing construction and demolition waste are subject to certification in the prescribed manner.

6.6. Secondary products for construction purposes that meet the requirements of clause 6.5 of the Procedure, on the basis of an application from the Moscow City Construction Department, are included in projects for the construction, repair, reconstruction and improvement of facilities on the territory of Moscow in agreement with the relevant customers for the construction, repair, reconstruction and improvement of facilities.
(Clause 6.6 as amended, put into effect on July 1, 2013 by Decree of the Government of Moscow dated March 6, 2013 N 129-PP.

7. Responsibility for violation of the procedure for handling construction and demolition waste in Moscow

7.1. For violation of this Procedure, depending on the types of violations and their consequences, economic, disciplinary, administrative, civil and criminal liability is established in accordance with the legislation of the Russian Federation, the laws of the city of Moscow, and other regulatory legal acts.

7.2. Responsibility for violation of this Procedure is borne by both waste producers and contractors involved by them to perform work on the process of handling construction and demolition waste.

Annex 1 of construction and demolition in Moscow. Standard form of technological regulations for the process of handling construction and demolition waste

Attachment 1
to the Waste Management Procedure
construction and demolition in Moscow
(As amended by
from July 1, 2013
Decree of the Government of Moscow
dated March 6, 2013 N 129-PP. -
See previous edition)

Standard form
technological regulations for the process of handling construction and demolition waste

Title page

REGISTERED

for register N______________

"___" _________________ 200__

______________________________

Full name, signature of the official

TECHNOLOGICAL REGULATIONS (TR)

circulation process (use, disposal)
with construction and demolition waste at the facility:

______________________________________________________________

name of the object, its location

Construction customer: _________________________________________________

General contractor: _________________________________________________

(Name,

Customer TR: _____________________________________________________________

legal and fact. address, contact phone)

TR developer: ________________________________________________________________

(name of the organization or full name of the individual entrepreneur,

legal and fact. address, contact phone)

________________________________________________________________________

(Position, full name, signature of the authorized representative, date)

Table 1 TR

"Types of construction and demolition waste generated at the facility, and volumes of their generation"

Types of construction and demolition waste generated at the facility (name)

Scope of education
(in tons)

Hazard Class
(III-IV)

Total by hazard class:


Notes:

1. The numbering of waste types is carried out in an ordinal manner in accordance with their hazard class (from the highest to the lowest), the sequential arrangement of waste types of one hazard class may be arbitrary.

2. It is necessary to keep the numbering of waste types (in accordance with Table 1) according to all subsequent tables.

Table 2 TR

"Accumulation and organization of temporary storage of construction and demolition waste at the facility"

Accumulation volumes at the facility
(in tons)

Detailed description of places of temporary storage (warehousing)

Temporary storage period (number of days from the moment of formation)


Note:

3. This table is accompanied by a diagram of the facility (scale not less than M 1:500) with the designation on it of all the places of temporary storage and storage of the generated construction and demolition wastes named in column 4.

Table 3 TR

"Removal of construction and demolition waste from the site"

Type of construction and demolition waste

Frequency of export from the territory and types (brands) of vehicles used

Export volume (in tons)

Organizations or individual entrepreneurs engaged in waste removal (full name, legal and actual address, contact phone number, N of the contract on the basis of which this activity is carried out)

The object to which the waste is exported (category, name, location, mileage of vehicles from the place of loading to the place of unloading of waste, full name of the organization or individual entrepreneur operating this object)


Notes:

4. Attached to this table:

- a copy of the agreement, according to which the waste exporting organization or individual entrepreneur carries out the removal of waste from the territory of this facility;

- detailed route scheme waste disposal with the designation of city highways through which waste is transported, as well as settlements located outside the city, through which or past which waste is transported.

5. If waste is removed by a waste producer, then this fact is reflected in column 5 instead of data on waste carriers.

Table 4 TR

"Use or disposal of construction and demolition waste"

For recyclable waste only

Type of construction and demolition waste

Organizations or individual entrepreneurs engaged in the processing or disposal of waste (full name, legal and actual address, contact phone number, N of the contract on the basis of which this activity is carried out)

The volume of waste received for processing or disposal (in tons)

Waste processing products (nomenclature, volume in tons for each item, where and how it is supposed to be used)

Owner of waste processing products (full name of the organization or individual entrepreneur)


Note:

7. Attached to this table:

- a copy of the agreement under which the organization or individual entrepreneur carries out the disposal or processing of waste;

- a copy of the document regulating the ownership of waste products (only for recyclable waste).

Table 5 TR

"Material-stage balance for generated construction and demolition waste"

Type of construction and demolition waste

Scope of education

Export volume

Volume of processing or disposal

The volume of processed products obtained

Losses in the waste management process (cause of formation, name, volume for each item)

(in tons)


_______________________________________________
_______________________________________________
(position, full name, signature of the person who developed the TR,
Date of preparation)

Appendix 2 to the Procedure for handling construction and demolition waste in Moscow. Nomenclature of construction and demolition waste, which are secondary resources, and priority areas for their use

Appendix 2
to the Waste Management Procedure
construction and demolition in Moscow

Table 1

Group: Organic waste

Subgroups


(processed products)

wood waste

wood-based materials and structures, wood-based thermal insulation materials, chipboard, plywood, fiberboard, MDF, joinery, wooden packaging, etc.

Wood plastics incl. complex profile, moisture resistant, etc.

Arbolit

Heat-insulating, sound-proofing boards

Paper and cardboard waste

paper wallpaper, packaging paper, cardboard packaging

Thermal insulation mixtures

Roofing materials (type "Ondulin")

- "Ecowool"

table 2

Group: Mineral-based waste

Subgroups

Name (list) of waste items

Priority areas of use
(processed products)

Waste based on natural stone

position:
battle of facing plates

Brecciated slabs

Mosaic tiles

position:
sludge waste from stone processing

Putty,

Plaster,

Fake diamond,

Decorative facade coatings

position:
cutting of side stones, paving stones, cobblestones and other waste based on natural stone

Waste based on concrete and construction

position:
reinforced concrete waste

solutions

position:
heavy concrete waste

position:
lightweight concrete waste


position:
cellular concrete waste

Powder fillers for the production of wall blocks and mixtures for monolithic casting

position:
waste of fiberboard, arbolite and cement-bonded particle boards

position:
dry waste plaster mixtures

Waste based on mineral binders

position:
waste of gypsum-based materials (panels and slabs for partitions, plasterboard sheets, ventilation blocks)

position:
waste of silicate materials (brick, cellular products)

position:
waste materials based on lime (lime-sand, lime-slag and lime-ash materials)

Asbestos-cement waste

roofing sheets, facing panels, pipes, ventilation box, electrical boards

Fillers for the production of fire-resistant wall blocks

Waste based on glass and equivalent

position:
cullet

Powder raw materials for non-autoclave production of foam concrete blocks or use in monolithic construction

position:
foam glass waste

position:
waste mineral wool, glass wool

position:
waste perlite, vermiculite products

Waste on a ceramic basis

brick fight, sanitary ceramics fight, faience and ceramic tile fight

press powders,

Mixtures for slip casting,

Additives for fire-resistant plasters,

Raw materials for the production of pigments

Table 3

Group: Waste on a chemical basis

Subgroups

Name (list) of waste items

Priority areas of use
(processed products)

Waste asphalt, tar concrete

Reclaimed (secondary) asphalt concrete

Waste rolled roofing and waterproofing materials

bituminous, tar, tar-bitumen, bitumen-polymer, rubber-tar and bitumen baseless materials (izol) and materials based on cardboard (roofing material, glassine, roofing felt), glass-based (glass-roofing material), asbestos paper (hydroizol)

Finely dispersed powders for the production of additives in asphalt concrete mixtures

Waste plastics and polymers

position:
waste of linoleums, polymer tiles

Additives for the production of wood plastics

position:
waste polymer roofing materials

position:
waste foam plastics and foam plastics (polystyrene, polyurethane)

Fillers for the production of wall blocks

Waste plastics and polymers

position:
plastic pipes for water supply, sewerage and electrical wiring

Finely dispersed powders for the production of secondary polymer products

position:
handrails for railings and stairs

position:
waste moldings based on polymers


Note:

Scrap of ferrous and non-ferrous metals is subject to obligatory processing and use. Recycling, use and acceptance of these wastes is carried out in accordance with the requirements of the current federal legislation.

Annex 3 to the Procedure for handling construction and demolition waste in Moscow. Standard form of the accompanying coupon for construction and demolition waste

Annex 3
to the Waste Management Procedure
construction and demolition in Moscow

ACCOMPANYING VOICE N ______________

for construction and demolition waste sent for: processing, disposal /underline as appropriate/

1. filled in by the waste producer

__________________________________________________________________________

Sent "___" ______________ 200__:

Name of waste

Amount of waste, t

Hazard Class

with a waste carrier:

__________________________________________________________________________

name, legal address

With: ________________________________________________________________________

name and location of the waste generation facility

__________________________________________________________________________

name of destination and waste recipient

2. filled in by a representative of the waste carrier

"___" _______________ 200__

__________________________________________________________________________

brand and state number of the vehicle used in the transportation of waste

__________________________________________________________________________

Name, driver or freight forwarder responsible for transportation

________________________________________

signature of the person responsible for the transport

3. filled in by the waste recipient

Accepted: "___" _____________ 200__:

Name of waste

Amount of waste, t

Hazard Class

Method of processing, burial

__________________________________________________________________________

name of the waste producer, legal address

__________________________________________________________________________

Position, full name, signature of the head

Appendix 2. Composition of the Coordinating Council under the Government of Moscow on the management of construction and demolition waste in Moscow (repealed)

On the procedure for handling construction and demolition waste in Moscow (as amended on March 6, 2013) (withdrawn from control)

I approve:

CEO

COMPANY "___________"

"__" ____________ 20__

Regulation (regulation)

about
waste management procedures for

COMPANY "___________"

G.
_____________ , 2012

1. BASIC CONCEPTS

Production and consumption waste (hereinafter referred to as waste)
- residues of raw materials, materials, semi-finished products, other products or products that have been formed in the process of production or consumption, as well as goods (products) that have lost their consumer properties;

waste management
- activities for the collection, accumulation, use, neutralization, transportation, disposal of waste;

waste disposal
- storage and disposal of waste;

waste storage
- content of waste in waste disposal facilities for the purpose of their subsequent disposal, neutralization or use;

waste disposal
- isolation of waste not subject to further use in special storage facilities in order to prevent harmful substances from entering the environment;

waste management
- the use of waste for the production of goods (products), the performance of work, the provision of services or for energy;

waste disposal
- waste treatment, including waste incineration and disinfection at specialized facilities, in order to prevent the harmful effects of waste on human health and the environment;

waste disposal facility
- a specially equipped facility designed for waste disposal (landfill, sludge dump, tailing dump, rocks and other);

cross-border movement waste
- movement of waste from the territory under the jurisdiction of one state to the territory (through the territory) under the jurisdiction of another state, or to an area not under the jurisdiction of any state, provided that such movement of waste affects the interests of at least two states;

waste disposal limit
- the maximum allowable amount of waste of a particular type, which is allowed to be placed in a certain way for a specified period in waste disposal facilities, taking into account the environmental situation in the given territory;

waste generation standard
- the established amount of waste of a particular type in the production of a unit of production;

waste passport
- a document certifying that waste belongs to waste appropriate type and hazard class containing information about their composition;

type of waste
- a set of wastes that have common characteristics in accordance with the waste classification system;

scrap and waste of non-ferrous and (or) ferrous metals
- products made of non-ferrous and (or) ferrous metals and their alloys that have become unusable or have lost their consumer properties, waste generated during the production of products from non-ferrous and (or) ferrous metals and their alloys, as well as irreparable defects that arose during the production process specified products;

waste collection
- reception or receipt of waste from individuals and legal entities for the purpose of further use, neutralization, transportation, disposal of such waste;

waste transportation
- movement of waste using vehicles outside the borders land plot owned by a legal entity or an individual entrepreneur or provided to them on other rights;

waste accumulation
- temporary storage of waste (for a period not exceeding six months) in places (on sites) equipped in accordance with the requirements of legislation in the field of environmental protection and legislation in the field of ensuring the sanitary and epidemiological welfare of the population, for the purpose of their further use, neutralization, placement, transportation.

2.
GENERAL PROVISIONS

The present
position
defines legal framework management of production and consumption waste in order to prevent harmful effects on human health and the environment natural environment, and the involvement of such waste in economic circulation as additional sources of raw materials.

Position
establishes the procedure for accounting and control over the formation, collection, storage, transportation, disposal and disposal of production and consumption waste on
COMPANY "___________"
(hereinafter referred to as the Enterprise).

Knowledge of the present situation
is mandatory for managers, specialists and personnel of structural divisions of the enterprise.

All waste, according to the degree of exposure to harmful substances on the human body, is divided into the following hazard classes:

I class - extremely dangerous;

Class II - highly dangerous;

III class - moderately dangerous;

IV class - low-hazard;

V class - practically harmless.

The activity of the Enterprise should be aimed at reducing the volume (mass) of waste generation, introducing waste-free technologies minimizing the generation of non-recyclable waste.

All waste generated in the course of economic activity of the enterprise must be transferred for disposal or neutralization to specialized organizations.

Also, the enterprise must make every effort to involve waste in economic circulation, collect and transfer waste for recycling and processing, and also carry out separate waste collection and sorting.

Validity of the provision if unchanged technological process, used raw materials and waste management is set equal to
5 years
from the date of approval by the head of the enterprise.

3. REQUIREMENTS FOR WASTE MANAGEMENT AT THE ENTERPRISE

All divisions of the Enterprise that have production and consumption waste, in accordance with federal law No. 89 "On production and consumption waste" are obliged:

-
Comply with the current environmental, sanitary-epidemiological and technological norms and rules when handling waste and take measures to ensure environmental protection and conservation natural resources;

-
Carry out separate collection of generated waste according to their types, hazard classes and other features in order to ensure their use, disposal (neutralization) and disposal.

Provide conditions under which waste does not have a harmful effect on the environment and human health if it is necessary to temporarily accumulate waste on the territory of the enterprise (until the waste is used or sent to a facility for disposal or disposal);

Keep accurate records of the presence, generation, use, disposal and disposal of all waste own production, because accounting data are used in the preparation of a summary statistical report for the enterprise in the form 2-TP (waste) and are the basis for calculating the fee for waste disposal;

-
The formation, collection, accumulation, storage of waste is an integral integral part activities of the Enterprise, in the course of which they are generated and must be included in the Waste Inventory List.

Transportation of waste should be carried out in ways that exclude the possibility of their loss during transportation, the creation of emergency situations, causing harm to the environment, human health, economic or other objects. Transportation must be carried out in accordance with the Rules for the Transport of Dangerous Goods by Road, the European Agreement on the International Carriage of Dangerous Goods by Road (ADR), etc., by specialized transport. An organization carrying out the transportation (transportation) of hazardous waste (except for hazard class 5) must have a license for the collection, use, neutralization, transportation, and disposal of waste of hazard class 1-4.

Waste disposal is allowed only
at specially equipped landfills under an agreement with specialized organizations that have an appropriate license for this type of activity.

Procedure for collection, accumulation and storage of waste

Depending on the toxicological and physico-chemical characteristics of the waste and its components, the waste may be temporarily stored:

In the production or auxiliary premises (warehouse, pantry, etc.);

In a temporary non-stationary warehouse;

In an open area.

The following requirements apply to temporary waste storage sites:

Temporary sites should be located on the leeward side in relation to residential development;

In order to protect against precipitation over the platforms there should be a canopy or shelter with a tarpaulin;

The surface of the site must have an artificial chemically resistant waterproof coating;

Along the perimeter of the site there should be an embankment, a separate network of storm drains with separate treatment facilities should be arranged;

The flow of contaminated stormwater from the storage area into the urban rainwater sewer system or discharge into nearby water bodies is not allowed;

Waste of hazard classes 1 and 2 should be stored in enclosed spaces (warehouses), separately, on pallets.

The frequency of removal of accumulated waste from the territory of the enterprise is regulated by the established limits for the accumulation of industrial waste, which are determined as part of the waste management project.

Waste of various hazard classes should be stored and transported as follows:

Hazard class 1 - in special sealed containers (containers, barrels, tanks). Metal containers must be checked for tightness, the wall thickness of the container must be at least 10 mm, and the corrosion rate of the material must not exceed 0.1 mm/year. Waste of the 1st hazard class must be removed from the territory of the enterprise within 24 hours;

2 hazard classes - in a reliable closed container (sealed polyethylene bags, plastic bags);

3 hazard classes - in paper, textile, cotton bags. Solid bulk waste (stored in containers, plastic bags and paper bags) must be removed from the territory of the enterprise within two days;

4 hazard classes - can be stored in bulk, in the form of ridges, it is allowed to transport in bulk.

If there are substances of different hazard classes in the composition of the waste, the maximum amount of accumulation, time and method of storage are determined by the presence of the most dangerous substances.

Hazard class I waste - spent mercury-containing lamps, are subject to collection and sent for demercurization in accordance with Instruction No. E-1 for waste management of hazard class 1 "Mercury lamps, fluorescent mercury-containing tubes used and defective".

During temporary storage of waste in non-stationary temporary warehouses and on sites on the territory of the enterprise in an open form (in bulk and in bulk) or in unsealed open containers, the following conditions must be provided:

The maximum allowable amount of temporary accumulation of waste at the site for temporary storage must comply with the data of the PNOLR. In case of exceeding the established limit, the waste must be immediately removed.

And the ingress of waste into wastewater and onto the soil is excluded

Persons handling waste on the territory of the enterprise must have professional training for the right to work with hazardous waste.

When handling waste, it is necessary to comply with fire safety rules and prevent waste from igniting. Waste incineration is also unacceptable.

Waste accounting procedure

Accounting in the field of waste management is carried out separately for each territorial separate division or branch and legal as a whole.

Accounting in the field of waste management is carried out on the basis of actual measurements of the amount of used, neutralized, transferred to other persons or received from other persons, placed waste.

If it is impossible to make actual measurements of the amount of used, neutralized, transferred to other persons or received from other persons, placed waste, accounting is kept on the basis of the following sources:

Technical and technological documentation;

accounting documentation;

Transfer and acceptance certificates;

Agreements.

All types of waste of I-V hazard class, generated, used, neutralized, transferred to other persons or received from other persons, as well as placed by a legal entity during the accounting period, are subject to accounting.

Waste hazard classes are determined according to hazardous waste passports (waste hazard class is established in accordance with the federal waste classification catalog (hereinafter - FKKO)).

Accounting data in the field of waste management is drawn up in written and / or electronic form according to the attached forms.

Filling in the accounting data tables in the field of waste management (hereinafter referred to as the accounting data tables) is carried out by the person responsible for accounting for the generated, used, neutralized, transferred to other persons or received from other persons, as well as placed waste, as waste is generated, used, neutralized , transfer of waste to other persons or receipt of waste from other persons, disposal of waste.

Accounting data is summarized based on the results of the next quarter (as of April 1, July 1 and October 1 of the current year), as well as the next calendar year (as of January 1 of the year following the accounting year) no later than the 10th day of the month following the specified period.

The sheet (sheets) of the accounting data table is certified by the signature of the person responsible for accounting for the generated, used, decontaminated, transferred to other persons or received from other persons, as well as placed waste, and an imprint of the round seal of the legal entity, as a result of which waste and / or which carry out activities in the field of waste management.

Each of the sheets is numbered in the upper right corner with an Arabic numeral, while the numbering of the sheets remains continuous throughout the entire quarter. Once a month, but no later than the 15th day of each month, the accounting sheets for the previous month are folded, with an attachment to them title page.

If a legal entity has a significant number of accounting sheets (more than 100 sheets) at the end of a calendar month, they can be stitched into several books, while each book is assigned a serial number, the numbering of sheets is kept through for a month.

All sheets, including the title page, are stitched and sealed on the last page with an imprint of a round seal and the head of the legal entity, as a result of whose activities waste is generated and / or which carries out activities in the field of waste management and the signature of the person responsible for accounting for the generated, used, neutralized transferred to other persons or received from other persons, as well as disposed waste.

Misprints, erasures, additions, crossed out words in the documents of accounting for generated, used, neutralized, transferred to other persons or received from other persons, as well as placed waste are not allowed.

All corrections must be certified by a signature (indicating the last name and initials of the person responsible for accounting for generated, used, neutralized, transferred to other persons or received from other persons, as well as placed waste) and the seal of the legal entity.

Filling Requirements
waste accounting data tables

1. Accounting data tables are maintained for each structural unit of the Bank.

2. All values ​​of the amount of waste are taken into account by the mass of waste in tons and are rounded:

with an accuracy of up to three decimal places (with an accuracy of a kilogram) - for wastes of I, II and III hazard classes;

with an accuracy of one decimal place - for wastes of IV and V hazard classes.

Obsolete fluorescent lamps containing mercury are reflected by the mass of the product.

3. In each row filled in the accounting data tables, the columns indicate the values ​​of the amount of waste or, in their absence, zero.

4. A separate line is allocated for each type of waste. Lines are grouped according to waste hazard classes: for hazard class I waste - lines from 101 to 199 inclusive; for wastes of II, III, IV and V hazard classes - from 201 to 299, from 301 to 399, from 401 to 499, from 501 to 599, respectively.

Lines 100, 200, 300, 400 and 500 indicate the total amount of waste, respectively, I, II, III, IV and V hazard classes.

5. Line 010 indicates total quantities waste of all types and hazard classes (from I to V). The values ​​in row 010 in each of the waste management accounting data tables for all columns must be equal to the sum of the values ​​in rows 100, 200, 300, 400 and 500 in the respective columns.

6. In columns A, B and C of the accounting data tables, respectively:

line numbers;

names of waste types grouped by hazard classes;

codes of waste types according to FKKO (in lines 100, 200, 300, 400 and 500, in the absence of the corresponding type of waste, zero is indicated in the FKKO).

7. In the table "Accounting data in the field of waste management by structural unit of an individual entrepreneur and legal entity":

column 3 indicates the amount of waste (for each waste type and waste hazard class) generated during the reference period;

column 4 indicates the total (column 5 + column 6) amount of waste (for each type of waste and for each waste hazard class) received during the accounting period from other structural units and from other individual entrepreneurs and legal entities;

column 5 indicates the amount of waste (for each type of waste and for each class of waste) received during the accounting period from other structural units;

column 6 indicates the amount of waste (for each type of waste and for each class of waste) received during the accounting period from other individual entrepreneurs and legal entities;

column 7 indicates the amount of waste (for each type of waste and for each waste hazard class) used during the reference period;

column 8 indicates the amounts of waste (for each type of waste and for each waste hazard class) disposed of during the accounting period;

column 9 indicates the total amount of waste (for each type of waste and for each waste hazard class) transferred to other structural units during the accounting period (column 10 + column 11 + column 12 + column 13);

column 10 indicates the amount of waste (for each type of waste and for each waste hazard class) transferred during the accounting period to other structural units for use;

column 11 indicates the amount of waste (for each type of waste and for each class of waste hazard) transferred during the accounting period to other structural units for disposal;

column 12 indicates the amount of waste (for each type of waste and for each hazard class of waste) transferred during the accounting period to other structural units for placement at operated waste storage facilities;

column 13 indicates the amount of waste (for each type of waste and for each hazard class of waste) transferred during the accounting period to other structural units for disposal at operated waste disposal facilities;

column 14 indicates the total amount of waste (for each type of waste and for each waste hazard class) disposed during the accounting period at operated waste disposal sites;

column 15 indicates the amount of waste (for each type of waste and for each waste hazard class) disposed during the reference period in operated waste storage facilities;

Column 16 indicates the amount of waste (for each type of waste and for each waste hazard class) disposed during the reference period in operated waste disposal sites. This also takes into account the placement of previously accumulated waste in operated waste storage facilities;

column 17 indicates the amount of waste (for each type of waste and for each waste hazard class) located at the end of the accounting period in operated waste storage facilities;

column 18 indicates the amount of waste (for each type of waste and for each hazard class of waste) accumulated for the purpose of further use, neutralization, disposal, transfer to other structural units, as of the end of the accounting period.

The amount of waste in storage at the end of the accounting period (column 17) is determined as the sum of the amount of waste in the operating waste storage facilities at the end of the accounting period and the amount of waste placed in the operated waste storage facilities during the accounting period (column 1 + column 18).

The amount of waste accumulated at the end of the accounting period (column 18) is determined as the sum of the amount of waste accumulated at the beginning of the accounting period, generated, accepted from other structural units and from other individual entrepreneurs and legal entities, minus the amount of waste used, neutralized, transferred to other structural divisions and placed in operated waste disposal facilities during the accounting period (column 2 + column 3 + column 4 - column 7 - column 8 - column 9 - column 14).

8. In the table "Waste accounting data accepted by an individual entrepreneur and a legal entity":

column 1 indicates the total (column 2 + column 3 + column 4 + column 5) amount of waste (for each type of waste and for each waste hazard class) accepted during the accounting period from other individual entrepreneurs and legal entities for use, neutralization, placement (including storage and disposal);

column 2 indicates the amount of waste (for each type of waste and for each waste hazard class) accepted during the accounting period from other individual entrepreneurs and legal entities for use;

column 3 indicates the amount of waste (for each type of waste and for each class of waste hazard) accepted during the accounting period from other individual entrepreneurs and legal entities for disposal;

column 4 indicates the amount of waste (for each type of waste and for each waste hazard class) accepted during the accounting period from other individual entrepreneurs and legal entities for placement in operated waste storage facilities;

column 5 indicates the amount of waste (for each type of waste and for each waste hazard class) accepted during the accounting period from other individual entrepreneurs and legal entities for disposal at operated waste disposal facilities;

column M indicates the last name, first name and patronymic (if any) of individual entrepreneurs or the names of legal entities from which the waste was received;

column H indicates the numbers and dates of the waste acceptance agreements.

9. In the table "Accounting data for waste transferred from an individual entrepreneur (legal entity)":

column 1 indicates the total (column 2 + column 3 + column 4 + column 5) amount of waste (for each type of waste and for each waste hazard class) transferred during the accounting period to other individual entrepreneurs and legal entities for use, neutralization, placement (storage and burial);

column 2 indicates the amount of waste (for each type of waste and for each waste hazard class) transferred during the accounting period to other individual entrepreneurs and legal entities for use;

column 3 indicates the amount of waste (for each type of waste and for each class of waste hazard) transferred during the accounting period to other individual entrepreneurs and legal entities for disposal;

column 4 indicates the amount of waste (for each type of waste and for each hazard class of waste) transferred during the accounting period to other individual entrepreneurs or legal entities for placement in waste storage facilities;

column 5 indicates the amount of waste (for each type of waste and for each waste hazard class) transferred during the accounting period to other individual entrepreneurs and legal entities for disposal in waste disposal facilities;

column M indicates the last name, first name and patronymic (if any) of individual entrepreneurs or the names of legal entities to whom the waste was transferred, as well as the date of issue and the license number for the collection, use, neutralization, transportation, disposal of waste of I - IV hazard class ( in the case of transfer of waste of I - IV hazard class) and the name of the authority that issued the said license;

column H indicates the numbers and dates of the waste transfer contracts.

10. In the table "Data in the field of waste management for an individual entrepreneur and a legal entity":

columns 1 and 2 indicate the amount of waste at the beginning of the accounting period (for each type of waste and for each waste hazard class) located in operated waste storage facilities (column 1) and accumulated for the purpose of further use, neutralization, disposal, transfer to other structural units as of the beginning of the accounting period (column 2);

column 3 indicates the amount of waste (for each waste type and for each waste hazard class) generated during the reference period;

column 4 indicates the amount of waste (for each type of waste and for each waste hazard class) received during the accounting period from other individual entrepreneurs and legal entities;

column 5 indicates the amount of waste (for each type of waste and for each hazard class of waste) used during the accounting period, column 6 indicates the amount of waste (for each type of waste and for each hazard class of waste) disposed of during the accounting period;

column 7 indicates the total (column 8 + column 9 + column 10 + column 11) amount of waste (for each type of waste and for each waste hazard class) transferred during the accounting period to other individual entrepreneurs and legal entities;

column 8 indicates the amount of waste (for each type of waste and for each waste hazard class) transferred during the accounting period to other individual entrepreneurs and legal entities for use;

column 9 indicates the amount of waste (for each type of waste and for each class of waste hazard) transferred during the accounting period to other individual entrepreneurs and legal entities for disposal;

column 10 indicates the amount of waste (for each type of waste and for each waste hazard class) transferred during the accounting period to other individual entrepreneurs and legal entities for placement in waste storage facilities;

column 11 indicates the amounts of waste (for each type of waste and for each hazard class of waste) transferred during the accounting period to other individual entrepreneurs and legal entities for disposal in waste disposal facilities;

column 12 indicates the amount of waste (for each type of waste and for each hazard class of waste) disposed during the reference period at operated waste disposal sites;

column 13 indicates the amount of waste (for each type of waste and for each waste hazard class) disposed during the reference period in operated waste storage facilities;

column 14 indicates the amount of waste (for each type of waste and for each waste hazard class) disposed during the reference period in operated waste disposal facilities;

column 15 indicates the amount of waste (for each type of waste and for each hazard class of waste) located at the end of the accounting period in operated waste storage facilities;

column 16 indicates the amount of waste (for each type of waste and for each hazard class of waste) accumulated for the purpose of further use, neutralization, disposal, transfer to other individual entrepreneurs and legal entities, as of the end of the accounting period.

The amount of waste in storage at the end of the accounting period (column 15) is determined as the sum of the amount of waste in the operating waste storage facilities at the beginning of the accounting period and the amount of waste placed in the operated waste storage facilities during the accounting period (column 1 + column 13).

The amount of waste accumulated at the end of the accounting period (column 16) is determined as the sum of the amount of waste accumulated at the beginning of the accounting period, waste generated, waste received from other individual entrepreneurs and legal entities, minus the amount of waste used, neutralized, transferred to others individual entrepreneurs and legal entities and placed in operated waste disposal facilities during the accounting period (column 2 + column 3 + column 4 - column 5 - column 6 - column 7 - column 12).

Sanitary requirements to waste transportation

Transportation of waste to the places of disposal, disposal, reuse and processing is carried out by specialized vehicles of the enterprise in accordance with SanPiN.

All work related to the loading, transportation, unloading of waste should be mechanized and sealed as much as possible.

Transportation of waste should be carried out in vehicles that exclude the possibility of losses along the way and environmental pollution, as well as providing convenience during reloading:

Transport for the transportation of semi-liquid (pasty) waste must be equipped with a hose device for draining;

When transporting dusty waste, a dumping device equipped with a canopy is required.

Transportation of waste to be removed for disposal at a city dump is allowed only if the relevant documents (waybills, license cards) are available.

When transporting waste, the presence of unauthorized persons is not allowed, except for the driver of the vehicle and the personnel accompanying the cargo.

Responsibility for violations of the requirements of the regulation

Heads of structural subdivisions bear disciplinary responsibility:

For failure to comply with the requirements of this instruction regarding the storage, disposal, transportation, loading and unloading of waste;

For the placement of waste in unauthorized or unequipped places for this purpose;

For violation of accounting, norms and rules for the formation, processing, use, disposal of waste;

For refusal to provide or provision of incomplete, distorted documentation (information) on waste management;

For the transfer of waste without accompanying documentation drawn up in accordance with the established procedure;

For the correct implementation of this instruction by subordinate personnel;

For the timely conclusion of contracts for the disposal of types of waste, and their implementation, the head of the household is responsible. site and environmental engineer.

For the timely removal to the landfill of the city of solid waste, the head of the household is responsible. site.

Safe waste management

Methods for collecting, storing and transporting waste should exclude the possibility of contamination of the surrounding area, the soil of populated areas and ensure the safety of personnel involved in all stages of waste treatment and disposal.

In accordance with environmental standards, the Enterprise must comply with the following requirements:

Store equipment and materials, production and consumption waste, organize parking of cars and equipment only in specially designated places;

Keep records of the generation, storage and disposal of waste;

Timely (before the 20th day of the first month of the quarter) provide reliable information on the volumes of generated, disposed, neutralized and used in the production of waste and the calculation of the fee for NVOS to the supervisory authorities;

Conduct environmental briefing for the company's personnel once a year.

Forbidden:

Discharge of untreated and not neutralized wastewater of all types of use on the terrain, in reservoirs and watercourses;

It is prohibited to dump waste into public water bodies, underground aquifers;

Burning various kinds waste in earth pits, containers, etc., that is, outside special devices equipped with a gas cleaning system for combustion products;

Accommodation in settlements, storage of industrial waste, industrial, household waste and other wastes that are sources of atmospheric air pollution with dust, harmful gaseous and foul-smelling substances, as well as the incineration of these wastes on the territory of the enterprise, except for cases when incineration is carried out using special installations in compliance with the requirements for the protection of atmospheric air;

The use of chemicals with unknown sanitary and toxicological characteristics;

Burial of potentially hazardous and highly toxic waste.

Waste control is carried out:

When collecting, storing, transporting, using, neutralizing and burying, the current environmental, sanitary and epidemiological, technical standards and rules for waste management must be observed;

An environmental engineer is responsible for the collection, accounting, disposal, disposal, use, transportation, and disposal of waste.

Once a month you need to check:

-
serviceability of containers for temporary accumulation of waste;

-
the presence of markings on containers for waste;

-
condition of sites for temporary waste disposal;

-
compliance of the temporarily accumulated amount of waste with the established one (visual control);

-
implementation of the frequency of waste removal from the territory of the enterprise;

-
compliance with the requirements of environmental safety and safety engineering when loading, transporting and unloading waste;

An environmental engineer is obliged to have a map of the territory with places for temporary disposal of waste marked on it, indicating the type of waste, the number of containers, the name of the person responsible for the place of accumulation of waste, and make changes to it in a timely manner.

The volume of transfer or disposal of waste must be documented (invoice, act). The waste movement journal is the primary reporting document, on the basis of which all further reports are generated.

Transportation of waste should be carried out in ways that exclude the possibility of their loss during transportation, the creation of emergency situations, causing harm to the environment, human health, economic and other objects. Transportation of hazardous waste is allowed only by specially equipped vehicles that have a special design in accordance with the current Rules and Regulations.

Transportation of hazardous waste must be carried out under the following conditions:

Availability of a hazardous waste passport;

Availability of specially equipped and equipped special characters Vehicle;

Compliance with safety requirements for the transportation of hazardous waste on vehicles;

Availability of documentation for the transportation and transfer of hazardous waste, indicating the amount of hazardous waste transported, the purpose and destination of their transportation.

Transportation of waste to an authorized city dump is carried out by the transport of the Garbage Collection Company of Krasnodar. Loading into transport, transportation, unloading must be carried out in accordance with sanitary regulations.

Each vehicle for transporting waste is equipped with: a set of tools for minor repairs, one fire extinguisher designed to extinguish a fire on the vehicle.

The vehicle must be provided with a hazard information system (hazard signs).

It is forbidden to transport goods on the vehicle that are not provided for by the documentation, as well as unauthorized persons not related to the transportation of this cargo.

Work related to the collection, storage, transportation of industrial waste is allowed to persons at least 18 years of age who have passed a medical examination, have been instructed in safety and fire safety, who know the toxic and explosive properties of waste, dangerous factors that may arise when performing work, and first aid measures, as well as those trained in the handling of hazardous waste.

At the waste collection point, it is allowed to store waste in an amount not exceeding the established norms. It is not allowed to store waste near sources of sparking, heaters and other sources of heat.

When storing several types of waste at the same time, their compatibility should be taken into account.

It is not allowed to clutter up the places of industrial waste collection and approaches to them.

It is not allowed to store foreign objects, personal clothing, overalls, personal protective equipment, or eat food in the places of industrial waste collection.

Wash hands thoroughly after handling hazardous waste and before eating. warm water with soap. To reduce dry skin, lubricate hands with petroleum jelly or silicone cream.

If signs of poisoning appear, stop work, notify the manager and contact a medical facility.

Places for collecting fire hazardous waste must be equipped with fire extinguishing equipment.

It is forbidden to clutter up approaches and access to fire-fighting equipment.

It is forbidden to smoke and use open flames at the sites for the collection and storage of fire hazardous waste.

It is necessary to know the characteristics of the waste and the rules for extinguishing a fire when it ignites. Extinguish flammable liquids, combustible liquids with a fire extinguisher, sand, asbestos cloth.

Extinguishing solvents with water is not allowed.

Persons who have undergone special instruction on safe methods of work are allowed to work on the elimination of emergency situations.

Persons not involved in emergency response work are removed from the danger zone.

Various chemical solutions and solvents spilled on the floor should be immediately neutralized and removed with sawdust or dry sand, and the floor should be wiped with a rag moistened with an appropriate solvent, after which the spilled area should be thoroughly washed with water and detergent or 10% soda solution. These works should be carried out in personal protective equipment (gas masks, respirators, gloves, etc.).

The type of floor covering for industrial premises should be selected depending on the type and intensity of impacts, taking into account special requirements for floors in accordance with SNiP 2.03.13 (Appendix 5).

Floor covering materials must be resistant to chemical attack and prevent the absorption of harmful substances.

Floors in production areas must be kept in good condition. Operation of floors with a damaged surface, potholes, irregularities is not allowed. In rooms where work with harmful chemicals, as well as in places of storage (according to GOST 12.4.026), appropriate signs should be posted.

Tanks for storing the required amount of lime, soda to neutralize accidentally spilled liquids, as well as sand to collect them should be installed in the warehouse and site for storing acids and oils.

It is forbidden to use fire and work in the vicinity of waste oil storage areas. welding work to avoid an explosive situation.

To eliminate an emergency in case of waste fire, extinguishing is carried out by primary fire extinguishing means.

According to the "Environmental requirements for enterprises of the transport and road complex" RD 152-001-94, the places of lubrication work must be equipped with containers for collecting used oils and filters and equipped in such a way as to exclude the possibility of soil and surface water contamination with oils. In case of emergency contamination of the earth's surface with fuel oil or oils, provide for chemical treatment of contaminated soil areas by distributing 1 kg of lime per 1 kg of oil product.

Transfusion of paints and varnishes from one container to another should be carried out on metal pallets with sides not lower than 50 mm. Paints and solvents spilled on the floor must be immediately removed with sand or sawdust and removed from the painting room.

4.
Waste movement and storage conditions

Waste name

Hazard Class

retreat movement

Storage conditions

Not allowed

Mercury lamps, fluorescent mercury-containing tubes used and defective (353 301 00 13 01 1)

Mercury lamps are used to illuminate rooms and territories. Waste is generated by replacing used lamps. Rented for neutralization to an organization that has the appropriate license (_______________)

They are stored in a hermetically sealed container (special metal container with a lid) in a closed (separate) room, which has good ventilation and a flat concrete floor. Special packaging must have certificates of conformity.

Storage of lamps outdoors; storage in places where they can be accessed by outsiders; storage of lamps without containers; storage of lamps in soft cardboard boxes, tumbled down on top of each other; storage of lamps on the ground surface; transfer of lamps to third-party organizations that do not have a license and equipment for the disposal of this waste.

Garbage from amenity premises of organizations, unsorted (excluding bulky)

(912 004 00 01 00 4)

It is formed as a result of the activities of employees of the enterprise and the cleaning of premises. Taken out for placement (burial) at the city dump
________________
under contract.

Temporary accumulation is allowed on the territory of the enterprise in metal containers for solid waste installed on specially equipped sites. The site for the collection of solid waste should be located on the leeward side of the territory of the enterprise, have a waterproof coating (cement concrete, asphalt concrete, etc.), a canopy, embankment and edging, a separate network of storm drains, and convenient access for special vehicles.

Container overflow; entry into containers of waste of hazard classes 1 and 2 (fluorescent lamps, batteries, combustible and flammable waste); use of MSW for backfilling roads, construction sites; incineration of solid waste on the territory of the enterprise, especially near residential buildings; storage of solid waste in open containers more than 1 week, and summer time more than 2 days.

Waste (garbage) from cleaning wholesale and retail trade in industrial goods

Formed as a result of the activities of employees of the enterprise
at
at the picking of objects
wholesale and retail trade in industrial goods. Taken out for placement (burial) at the city dump
______________________
under contract.

Consumption waste in production, similar to municipal waste (garbage, sweeps from the territory of the enterprise)

(912 000 00 00 00 0)

Formed as a result of cleaning the territory of the enterprise. Taken out for placement (burial) at the city dump
____________________
under contract.

Download the regulation (regulation) on the procedure for handling waste at the enterprise

Development this project currently not required.

During the demolition, dismantling, repair or construction of buildings, industrial facilities, roads and other engineering structures, one way or another, waste is generated. The procedure for dealing with this waste is determined by Technological regulations for the management of construction waste(TROSO), which should be developed in firms engaged in construction for each specific object separately.

BASE:

Order of the administration of St. Petersburg dated May 15, 2003 N 1112-ra "On approval of the Rules for the management of construction waste in St. Petersburg".

Exactly at TROSO in accordance with Russian “environmental legislation”, the amount of generated waste is substantiated, and rules for working with them are established: where to store, how to account, neutralize, where to bury and to whom to transfer.

Regulations for the management of construction waste should be based on the regulatory requirements for project documentation, determined by the Committee for Urban Planning and Architecture.

This document is obligatory even at the stage of preparation of the working draft of the object, because without it, it is impossible to obtain a permit for construction work at the State Administrative and Technical Inspectorate. In order to obtain a construction permit, the construction waste management regulations must be properly drawn up and agreed upon in all necessary instances: in the Committee for Nature Management, Environmental Protection and Environmental Safety.

What does the technological regulation for the management of construction waste (TROSO) include?

  • enumeration of the main types of waste that can be generated during construction;
  • an indication of the places where it is planned to store these wastes;
  • indication of the method of waste disposal from the facility;
  • calculation of the hazard class and the approximate amount of waste that will be generated during the entire period of construction, as well as their characteristics;
  • preparation of an action plan to reduce the amount of waste generated and, as a result, reduce the harmful impact on the environment;
  • a brief description of object.

After construction is completed, the construction waste management regulations must be “closed” in the Committee for Nature Management, i.e. notification must be received that the construction work has been carried out in accordance with this regulation.

What do you need to get the technological regulations for the management of construction waste (TROSO)?

  • contracts with organizations that carry out the removal and disposal of construction waste throughout the entire construction period;
  • waste acceptance certificates signed by both parties;
  • calculations " ecological fee» for the negative impact of construction waste, as well as documents confirming their payment.

If there are no specialists in the organization - who are able to develop a regulation or, on the contrary, “close” it, our organization will come to the rescue. EcoPromCentre is a team of qualified specialists who can provide technical support for the construction of any facility, saving you time and effort.

Please repost our content:

sp-force-hide(display:none;) .sp-form(display:block;background:#1b2a4b;padding:20px;width:100%;max-width:100%;border-radius:5px;-moz- border-radius:5px;-webkit-border-radius:5px;border-color:#000000;border-style:solid;border-width:1px;font-family:Arial, "Helvetica Neue", sans-serif;) .sp-form-fields-wrapper(margin:0 auto; width:690px;) .sp-form .sp-form-control(background:rgba(255, 255, 255, 1);border-color:rgba(0 , 0, 0, 1);border-style:solid;border-width:1px;font-size:15px;padding-left:8.75px;padding-right:8.75px;border-radius:4px;-moz-border -radius:4px;-webkit-border-radius:4px;height:35px;width:100%;) .sp-form .sp-field label(color:rgba(255, 255, 255, 1);font-size :13px;font-style:normal;font-weight:bold;) .sp-form .sp-button(border-radius:4px;-moz-border-radius:4px;-webkit-border-radius:4px;background -color:#00cd66;color:#ffffff;width:100%;font-weight:bold;font-style:normal;font-family:Arial, "Helvetica Neue", sans-serif;box-shadow:none;- moz-box-shadow:none;-webkit-box-shadow:none;) . sp-form .sp-button-container(text-align:left;width:100%;)